Platinum ongoing projects
Ongoing Projects Built on Quality Assurance

Platinum Vista @ Manikonda
Developed on 300 sq yards, single block, Stilt plus five floors, offering 10 spacious 2BHK homes 5 blocks 50 flats
-
Project Start: December 2023
-
Expected Handover: January 2026

Platinum Avenue | || ||| |||| @ Patancheru
Developed on 1,850 sq yards with five blocks, Stilt plus five floors, offering 58 well-planned flats 70 flats 2 BHK
-
Project Started: March 2024
-
Expected Handover: April 2026

Platinum Avenue – Independent Villas, @ Patancheru
five G+1 independent villas on 108–125 sq yards each, in a strategic location with excellent connectivity
-
Project Start: December 2023
-
Expected Handover: January 2026

Platinum Grande @ Bachupally
Developed on 500 sq yards, single block, stilt plus five floors, offering 10 spacious 3BHK homes
-
Project Start: August 2025
-
Expected Handover: October 2026
Proposed project @ Bandalaguda
The Proposed project , at Bandalaguda enjoys a strategic location with close proximity to prominent educational institutions, hospitals, and the Outer Ring Road (ORR), ensuring excellent connectivity and convenience. Developed on a land parcel of 1089 square yards, the project comprises one residential complex with stilt plus five floors, and offering a total of 30 residential units consisting of 2 BHK and 3 BHK Flats.The project commenced in November 2025 and is scheduled for handover by January 2027, subject to force majeure conditions and receipt of all statutory approvals. The development is thoughtfully planned with adequate infrastructure and modern amenities, and is executed with due care, engineering precision, and attention to detail. Construction is carried out strictly in accordance with approved plans, applicable statutory regulations, and standard construction practices, ensuring superior quality, functionality, and contemporary residential living.
-
Specifications: Super Luxury
-
Connectivity: Close to ORR
our Ongoing projects
Crafting Quality, Step by Step with Trusted Development

Platinum Vista I, II, III @ Manikonda
-
Project Start: December 2023
-
Expected Handover: January 2026

Platinum Avenue I, II, III, IV @ Patancheru
-
Project Started: March 2024
-
Expected Handover: April 2026

Platinum Grande @ Bachupally
-
Project Start: August 2025
-
Expected Handover: June 2026

Individual House @ Patancheruvu
-
Project Start: August 2025
-
Expected Handover: June 2026